Thread Consumption For a Knit Jacket

At first we should take middle size sample. If the sizes are S, M, L among this we need size “M”. Then follow the sample style like-

  1. Types of machine & stitch produced from M/C used to complete garments .
  2. Types of thread used to complete garments.
  3. Should have enough knowledge about different process of a garment.
  4. Should have knowledge about different machine value such as  m/c consume how much percent threads.
  5. Check SPI of each process
  1. First measure the length of seam in inch, then multiply by machine value, then we get total thread value in inch, then divided the total thread value in inch by 39.37 for getting value of Total thread in  Ex- O/L M/c value 24 ,Seam length of sleeve join is 51inch , so 54*24=1224 inch, then 1224/39.37=31.09 meter.

Chart of  Machine value of different Machine  are given below :

SL No: Machine Type Total Needle Total Bobbin Total looper Total Chillkati Total Thread SPI Stich Gape Needle % Bobbin % Looper % Chillkati % Total Inch
1 S/N 1 1 0 0 2 12 0 50% 50% 0 0 5
2 D/N 2 2 0 0 4 12 6 MM 50% 50% 0 0 10
3 Chain Stitch 1 0 1 0 2 12 0 34% 0 66% 0 7
4 Bar tack 1 1 0 0 2 0 1.5 CM 50% 50% 0 0 21
5 Button Hole 1 1 0 0 2 0 2CM 50% 50% 0 0 28
5 Button stitch 1 1 0 0 2 0 4 hole cross 50% 50% 0 0 14
7 Picoting 1 0 1 0 2 0 0 36% 0 64% 0 14
8 Over lock 1 0 2 0 3 12 3MM 18% 0 82% 0 15
 

 

1 0 2 0 3 12 6MM 16% 0 84% 0 16
 

 

2 0 2 0 4 12 6 MM 30% 0 70% 0 24
 

 

2 0 2 0 4 12 3 MM 21
 

 

2 0 3 0 5 12 6 MM 24% 0 76% 0 26
9 Blind stitch 1 0 2 0 3 12 3MM 18% 0 82% 0 18
 

 

1 0 2 0 3 12 6MM 16% 0 84% 0 20
10 F/L 1 0 1 0 2 12 0 34% 0 66% 0 8
 

 

2 0 1 0 3 12 6 MM 30% 0 70% 0 22
 

 

2 0 1 0 3 12 3 MM 30% 0 70% 0 20
 

 

2 0 1 1 4 12 3 MM 33% 0 44% 23% 23
 

 

2 0 1 1 4 12 6 MM 27% 0 43% 30% 24
 

 

3 0 1 1 5 12 3 MM 32% 0 44% 24% 26
 

 

3 0 1 1 5 12 6 MM 43% 0 37% 20% 30
11 FOA 2 0 2 0 4 12 34% 0 66% 0 18
12 KANSAI 1 0 1 0 2 12 0 34% 0 66% 0 8

 

 

Now I am going to explain a practical sewing thread consumption of knit jacket .

       

Item Jacket      
    ABC    
BLK:  A IE Department    
Style: B   Date: 08/09/2018      
Buyer: C      
SL No. Process Name M/C Measurement M/C Value Total Thread (Inch) Total Thread (Meter) Body Color Contrast Color
1 Back & Front  panel join O/L 88 24 2112 53.64 53.64
2 Back & Front  panel t/s F/L 88 30 2640 67.06 67.06
3 Pocket 1st part join O/L 20 24 480 12.19 12.19
4 Pocket piping F/L 20 8 160 4.06 4.06
5 Pocket 2nd part tack P/M 20 5 100 2.54 2.54
6 Pocket 2nd  part servicing O/L 20 24 480 12.19 12.19
7 Pocket  close O/L 29 24 696 17.68 17.68
8 Zipper facing make & t/s P/M 32 5 160 4.06 4.06
9 Facing servicing O/L 27 24 648 16.46 16.46
10 Zipper  join to Facing +Zipper join & t/s P/M 128 5 640 16.26 16.26
11 Sleeve panel join O/L 53 24 1272 32.31 32.31
12 Panel t/s F/L 53 30 1590 40.39 40.39
13 Sleeve join O/L 51 24 1224 31.09 31.09
14 Armhole t/s F/L 51 30 1530 38.86 38.86
15 Side seam O/L 80 24 1920 48.77 48.77
16 Collar make O/L 20 24 480 12.19 12.19
17 Collar piping F/L 20 8 160 4.06 4.06
18 Collar servicing O/L 22 20 440 11.18 11.18
19 Collar join O/L 22 24 528 13.41 13.41
20 Shoulder join O/L 12 24 288 7.32 7.32
21 Neck tape piping P/M 22 5 110 2.79 2.79
22 Piping close P/M 22 5 110 2.79 2.79
23 Sleeve hem F/L 30 22 660 16.76 16.76
24 Body hem F/L 57 22 1254 31.85 31.85
25 All Tack P/M 50 5 250 6.35 6.35
Total 19932 506.27 492.56 13.72

 

 

Here , we used

M/C                                       M/C Value.

* P/M (Plain m/c)                            05

* 2 Thread F/L (Flat lock m/c)         08

* 3 Thread F/L                                22

* 5 Thread F/L                                 30

* 4 Thread O/L (over lock m/c)        24

Finally we get 507 meter sewing thread we need to complete one pcs garments.

If  we have order qty 25000 pcs ,how much sewing thread we need to complete  this order?

So, 25000*507=12675000 meter/4000 meter per cone .So 3168 cone + add wastage percent .

(75)