Home Yarn Engineering Speed Frame Production Calculation

Speed Frame Production Calculation

5.03K
6
Md Sohanur Rahman Sobuj
Student of Bangladesh University of Textiles (BUTex)/ Department: Apparel Engineering
Md Sohanur Rahman Sobuj
Md Sohanur Rahman Sobuj
Md Sohanur Rahman Sobuj

Speed Frame Production Calculation

Speed Frame Production Calculation Math 1:

 Calculate the TPI (twist per inch) produced on a simplex with diameter of front roller 28 mm and its rpm be 30. The rpm of flyer is 1000.

Solution:

math1

Speed Frame Production Calculation Math 2:

Calculate the TPI on simplex if the diameter of back roller is 15/16’’, rpm of B.R is 10, rpm of flyer is 1000 and draft is 6.

Solution:

math2

Speed Frame Production Calculation Math 3:

Find out the production/shift in lbs. of a simplex machine. (Assume necessary parameters).

Solution:

math4

Speed Frame Production Calculation Math 4:

Find out the production per shift of a modern speed frame at 85% efficiency to produce 1.5 hank roving. Assume necessary parameters.

Solution:

math5

(5028)

Comments

comments

Powered by Facebook Comments

Md Sohanur Rahman Sobuj Student of Bangladesh University of Textiles (BUTex)/ Department: Apparel Engineering